H1

Products >> Cosmo5
Puma

Cosmo5

Construction Management System

Cosmo5 is an application for the management and control of the warehouse on construction site. Furthermore it allows controlling prefabrication and erection phases of industrial plants. Here are main features of Cosmo5.

Management of site Warehouses

Cosmo5 is able to perform the management of a single warehouse as well as of several warehouses in case of very large plants. Through the functions which permit control of goods handling it is possible to maintain updated availability of materials in warehouse with the possibility of producing every time the situations related to handling and availabilities of materials located in the warehouses.

Feasibility analysis

Cosmo5 may be utilized as decision support tool to optimize the prefabrication and erection processes of piping bulk materials. The functions are available to perform the feasibility analysis permit to find out which Spools are possible to construct based on specific warehouse materials availability.

Furthermore the analysis activities may be carried out in Real and Provisional modality. The first one uses the real warehouse availability and the second one uses the materials quantities and delivery dates as shown in the Packing Lists and Purchase Orders. The obtained feasibilities may be saved and utilized to book the materials available in the warehouses without deliver them. It is also possible to off load the warehouse directly from the feasibility analysis, thus obtaining automatically the delivery notes print-out.

Management of procurement documents

Cosmo5 utilizes the procurement documents Material Requisitions, Purchase Orders and Packing Lists to produce the materials situations based on several status, i.e. Required, Ordered, Shipped, Arrived at site, in order to control the above said handling phases and plan the construction activity dates. Furthermore it permits to minimize the manual input and the reuse of data from the previous Procurement and Expediting phases.

Packing Lists are utilized as template to handle the materials loading in the warehouse and to perform provisional feasibility analysis based on the delivery dates as shown in the Purchase Orders and Packing Lists.

Progress control

Cosmo5 permit to monitor the progress of the project through the definition and utilizations of working phases.