| Cosmo is an application
for the management and control of the warehouse on construction
site. Furthermore it allows controlling prefabrication and erection
phases of industrial plants. Here are main features of Cosmo.
Management of site Warehouses
Cosmo is able to perform the management of a single warehouse as well
as of several warehouses in case of very large plants. Through the
functions which permit control of goods handling it is possible
to maintain updated availability of materials in warehouse with
the possibility of producing every time the situations related to
handling and availabilities of materials located in the warehouses.
Feasibility analysis
Cosmo may be utilized as decision support tool to optimize the prefabrication
and erection processes of piping bulk materials. The functions are
available to perform the feasibility analysis permit to find out
which Spools are possible to construct based on specific warehouse
materials availability.
Furthermore the analysis activities may be carried out in Real and
Provisional modality. The first one uses the real warehouse availability
and the second one uses the materials quantities and delivery dates
as shown in the Packing Lists and Purchase Orders. The obtained
feasibilities may be saved and utilized to book the materials available
in the warehouses without deliver them. It is also possible to off
load the warehouse directly from the feasibility analysis, thus
obtaining automatically the delivery notes print-out.
Management of procurement documents
Cosmo utilizes the procurement documents Material Requisitions,
Purchase Orders and Packing Lists to produce the materials situations
based on several status, i.e. Required, Ordered, Shipped, Arrived
at site, in order to control the above said handling phases and
plan the construction activity dates. Furthermore it permits to
minimize the manual input and the reuse of data from the previous
Procurement and Expediting phases.
Packing Lists are utilized as template to handle the materials loading
in the warehouse and to perform provisional feasibility analysis
based on the delivery dates as shown in the Purchase Orders and
Packing Lists.
Progress control
Cosmo permit to monitor the progress of the project through the definition
and utilizations of working phases.
|